Illinois Tollway's Calendars

Contact Us

 

 

(800) UC-IPASS
(800) 824-7277

Hours:
Weekdays: 6 a.m. - 10 p.m.
Weekends: 8 a.m. - 5 p.m.

Find a Customer Service Center near you

Hours:
Weekdays: 7 a.m. - 6 p.m.

Illinois Tollway
2700 Ogden Ave
Downers Grove, IL 60515

Directions

(800) TOLL-FYI
(800)-865-5394


TRUCKING PERMITS

(630) 241-6800 Extension 3847

MEDIA RELATIONS

(630) 241-6800 Extension 2385

 
 

Faq Module - Align Left Example

Items

Faq Module - Align Left Example

Click on the description to see more information.

Type a response here

Type a response here 2

Illinois Tollway's Calendars

About I-Pass Faqs

Vtolls, Ttolls

 

Contact the I-PASS Team

About I-PASS FAQs

Building Green

The Tollway is committed to "Building Green" and minimizing the environmental impact of construction by reducing, recycling and reusing materials. In 2014, recycled materials on the Jane Addams Memorial Tollway (I-90) Rebuilding and Widening Project - 1,190,574 tons - could be used to build a bike path 2,334 miles long. These materials included: 567,328 tons of recycled asphalt pavement - enough to build a 1.3-mile-square parking lot, 156,963 tons of recycled aggregate - enough to fill nearly 36 Olympic-size swimming pools and 466,283 tons of recycled concrete - enough to fill a bumper-to-bumper line of dump trucks 140 miles long.

The Tollway is installing energy efficient lighting along the corridor and undertaking projects that will protect and restore native prairie, forested fen and wetlands as part of the Tollway's wetland mitigation efforts.

In addition, the new Illinois Route 47 Interchange that opened in November 2013 features several new green construction initiatives, including a geothermal water piping system that makes use of the earth's natural heating and cooling abilities to help heat and cool nearby plaza buildings in a more cost-effective and sustainable manner, reflective roofs and trellised vegetation for plaza buildings to further reduce heating and cooling costs, as well as ramp shoulder pavement that will allow water to seep through and reduce stormwater runoff.

Smart, State-of-the-Art, 21st Century Corridor

The new Jane Addams Memorial Tollway (I-90) will incorporate the latest technologies available on the market today, including active traffic management (ATM) on a portion of the roadway to make I-90 safer and more efficient for the benefit of Tollway customers.

The new I-90 will include flexible infrastructure to enable the Tollway to add new "smart" features as needed or as they become available in the years to come.

Frequently Asked Questions

For answers to frequently asked questions or to contact the Illinois Tollway, select the appropriate topic below or visit the Tollway FAQ page.

Send us your feedback

About Our Roadway

Compliment, Complaint, Report a Pothole

Leave Feedback About Our Roadway

About A Tollway Employee

The Interactive Tollway Map

Illinois Tollway Virtual Map is an interactive map designed to assist customers in finding location-specific information, including;

Legal Disclaimer

This trip calculator is intended for informational purposes only. The results of your inquiry represent the anticipated tolls you will be required to pay based upon the information you supplied. While every attempt has been made to ensure that these results are accurate and reliable, the Illinois Tollway recognizes that human and/or mechanical errors are possible. Accordingly, the Illinois Tollway, on its own behalf and on behalf of its employees, officer and agents makes no representation as to the accuracy, completeness or suitability of the information provided herein and denies any express or implied warranty of the same.

this is a title

This is a column
¿¿¿¿¿¿¿

Download or Order a System Map

Illinois Tollway System Map

System Map

System Map

Download Now

System Map With Rates

System Map With Rates

Download Now

Pick Up A Complimentary Tollway System Map

Complementary maps of the illinois Tollway are available at all toll plazas and oases.

If you would like a Tollway map sent to you complete the form below

 

* This field is required.